JBR 30 SERVICE PIT
COMPLEX OFFER – DESIGN, PRODUCTION, DELIVERY, ASSEMBLY
All service pits designated for vehicle service and control are certified by the Engineering Test Institute and they are in concordance with Governmental Decree No. 176/2008 Sb. (Coll.) and Regulation of the European Parliament and the Council No. 2006/42/ES.
They are in compliance with requirements on health and safety protection. The service pits are in compliance with the Governmental Decree No. 101/2005 Sb. (coll.) , s. 7 (1) to 7 (7) regulating the requirements on service pits.
When offering solutions of the service pit version we put the accent on design, structure and technical equipment of the pit working interior.
Equipment of the service pit is always specific according to customer´s requirements based on his service needs.
Technical description
OTHER EQUIPMENT
- Stairs with 7 steps, length 1,5 m – 1 piece (one step height 188 mm)
- Ladder – 1 piece (entry side)
- Grid flooring with a sump
- STYRODUR insulation of 20 mm thickness – light blue
- Basic and top coating (finish coat RAL 7035a, finish coat inertol Sika poxitar F- shade 9017)
Basic Equipment of the Service Pit
AIR-CONDITIONING EQUIPMENT
- Fresh air supply (DN 100) according to ČSN 73 6059 – 3
Additional equipment of the service pit for extra costs
BRAKE EXTENSION FOR A BRAKE BENCH
The brake extension is designated for storage of technical equipment of brake bench adjustment; it is produced from steel plates and sections. The brake bench is designated for measurement of:
- Left / right brake force
- Left / right rolling-resistance force
- Ovality level
- Front and rear brake efficiency
- Total brake efficiency of the vehicle
- Parking brake efficiency
AXIAL EXTENSION FOR CLEARANCE DETECTOR
The axial extension is designated for storage of technological equipment for geometry alignment of wheels. The axial extension of the service pit is produced from steel plates and sections. Inputs for electrical installation and drainage of liquids are made in the axial extension of the service pit.
Individual stages of construction readiness
1st stage –excavation pit realization
2nd stage – base plate preparation
3rd stage – placing the service pit on the base plate
4th stage – connecting of the service pit with the service floor